Boys Hostel, Bhubaneswar
CompletedBhubaneswar, Odisha
Our role: End-to-end structural consultancy: design and detailing
Buildings
- 2,15,000sq.ft built up
- 1,150 tStructural steel (approx.)
- 9Storeys (G+8)
A G+8 hostel for a government engineering college, standing on composite columns: steel sections encased in concrete.
- Owner
- Government engineering college, Bhubaneswar
- Our role
- End-to-end structural consultancy: design and detailing
- Status
- Completed
- Year
- 2019
- Place
- Bhubaneswar, Odisha
- Sector
- Buildings
The complexity
A large building carried on composite columns, with steel inside concrete, steel beams and composite deck floors. At every joint, steel and concrete must share the load, tied together by shear studs.
How we simplified it
One team did the design and the 3D detailing, so every connection we drew was one we had already checked.
Result
About 1,150 tonnes of steel, delivered with precise, buildable connections.
Technical details
For engineers: scope, numbers and codes.
| Scope | G+8 steel and concrete composite building: concrete-encased steel columns, steel beams, composite deck slabs with shear studs |
|---|---|
| Numbers | 2,15,000 sq.ft; about 1,150 t structural steel |
Next projectPlant Structures, IOCL ChennaiChennai, Industrial & Plants