Cross Country Gallery & Trestle, JSW

Under construction

Dolvi, Maharashtra
Our role: Connection design, structural 3D modelling and detailing
Industrial & Plants

Cross Country Gallery & Trestle, JSW, engineering model Cross Country Gallery & Trestle, JSW, under construction Cross Country Gallery & Trestle, JSW, on completion
  • 6,300 tTotal steel
  • 150 tSingle gallery lift
  • 3,500 tDelivered so far

A very long conveyor route across JSW's Dolvi steel plant: galleries over many spans, carried on steel trestles.

Owner
JSW
Our role
Connection design, structural 3D modelling and detailing
Status
Under construction
Year
2026, ongoing
Place
Dolvi, Maharashtra

The complexity

Each gallery, about 150 tonnes, is assembled on the ground and lifted whole onto its trestles. Every piece must be sized to travel, every joint must fit at height, and the order of work matters.

How we simplified it

We designed the connections to suit the assembly pieces, so each part can be transported, assembled at ground level and lifted into place.

Result

About 3,500 of 6,300 tonnes delivered so far, ready for smooth fabrication and erection.

Technical details

For engineers: scope, numbers and codes.

ScopeConveyor galleries and trestles: long inclined and curved galleries on braced towers and transfer towers, in hot-rolled angles, channels, hollow and plated sections
Numbers6,300 t in total; about 3,500 t delivered
Next projectJetty Area Gallery & Trestle, JSWDolvi, Maharashtra, Industrial & Plants
Jetty Area Gallery & Trestle, JSW

Have something hard to build?

Send the drawings or the brief. We will come back to you.

Discuss your project