
Brahmapuri Metro Station, NCRTC
CompletedMeerut, Uttar Pradesh
Our role: Structural 3D modelling and detailing
Metro & Rail
- 290 tHollow-section steel (approx.)
A station that curves along its length, roofed with 3D trusses on inclined columns, all in hollow steel sections.
- Owner
- NCRTC
- Our role
- Structural 3D modelling and detailing
- Status
- Completed
- Year
- 2023
- Place
- Meerut, Uttar Pradesh
- Sector
- Metro & Rail
The complexity
Square, round and rectangular hollow sections meet at irregular angles, along a building that curves in plan and leans on inclined columns.
How we simplified it
We solved every truss intersection in 3D and kept the model clash-free, so each odd angle reached the shop as a buildable joint.
Result
The package moved smoothly through review, fabrication and site work.
Technical details
For engineers: scope, numbers and codes.
| Scope | 3D truss-rafter roof and inclined columns in SHS, CHS and RHS sections; irregular truss intersections, multi-axis alignment, non-standard connection angles |
|---|---|
| Numbers | About 290 t |
Next projectPMR-5 Metro Station, Pune MetroPune, Metro & Rail

Have something hard to build?
Send the drawings or the brief. We will come back to you.
Discuss your project














