Bow String Girder Bridges, Indian Railways
CompletedHyderabad
Our role: Structural 3D modelling and detailing
Bridges, Metro & Rail
- 72 + 78 mTwo spans
- 1,570 tWelded steel (approx.)
Two steel arch bridges for Indian Railways, built from welded box girders with no bolted joints.
- Owner
- Indian Railways
- Our role
- Structural 3D modelling and detailing
- Status
- Completed
- Year
- 2021
- Place
- Hyderabad
- Sector
- Bridges
The complexity
Curved arch girders made of closed steel boxes, joined only by welds. Every diaphragm, stiffener and cross-frame sits inside a box that is welded shut.
How we simplified it
We modelled every plate inside the boxes, planned the weld sequence and split the girders into segments that keep welding distortion in check.
Result
A construction-ready model that set the plan for fabricating and erecting both bridges.
Technical details
For engineers: scope, numbers and codes.
| Scope | Two bow string girder bridges in steel plate box sections, fully welded; curved arch girders, tie girders, internal diaphragms, stiffeners and cross-frames; weld sequencing and fabrication segments |
|---|---|
| Numbers | Spans of 72 m and 78 m; about 750 t and 820 t |